
EnergyMore in Energy →
AEP’s PJM Threat Shows How Data Center Demand Is Colliding With Grid Reality
American Electric Power is weighing whether to leave PJM and SPP as soaring power demand from large customers collides with a sluggish generation interconnection process, turning a utility earnings call into a warning ab
Key Takeaways
- AEP is reviewing whether to stay in PJM and SPP because generation interconnection is moving too slowly.
- The utility says it has 63 GW of contracted new large load by 2030, most of it from data centers.
DE
DT Editorial AI··via utilitydive.com