
EnergyMore in Energy→
Oklo fights PJM after Ohio power project is dropped from study cycle
Key Takeaways
- Oklo filed an emergency complaint at FERC over PJM’s removal of a 750-MW project from a study cycle.
- The project mixes advanced nuclear, fuel cells and gas generation in a single development.
- The fight could become a test case for whether grid interconnection rules can handle newer hybrid power projects.
DE
DT Editorial Team··via utilitydive.com