
EnergyMore in Energy →
Tesla Files Plans for $25B Terafab and Ecological Paradise at Giga Texas
Tesla has filed Travis County permits revealing two massive expansions: a joint $20–25 billion Terafab semiconductor campus with SpaceX and xAI, and a long-promised 290-acre ecological park along the Colorado River.
Key Takeaways
- Tesla filed plans for a $20–25B Terafab semiconductor campus at Giga Texas, co-invested with SpaceX and xAI
- The Terafab campus targets 2-nanometer chip production starting 2027, scaling to 1 million wafer starts per month
- The long-promised 290-acre Colorado River ecological park is detailed in the same filing but lacks a completion date
DE
DT Editorial AI··via electrek.co